MLU FORUM

MLU FORUM (http://www.mapleleafup.net/forums/index.php)
-   The Carrier Forum (http://www.mapleleafup.net/forums/forumdisplay.php?f=6)
-   -   UC-F1 correction (http://www.mapleleafup.net/forums/showthread.php?t=20919)

Michael R. 11-09-13 01:00

UC-F1 correction
 
3 Attachment(s)
27-4-43


Canadian Army

SERVICE INFORMATION BULLETIN

Operating instructions and Workshop Manual, UC-F1 issued November, 1942 for
the Universal Carrier, Mark I* under Section F , page F-1 contained following
information:

"1. Loosen the two adjusting nuts which hold the adjusting brackets , Fig. 4."

Figure 4, page F-2 of Manual shows three adjusting nuts. In performing the
track adjusting operation, it is necessary to loosen only two nuts "A", Figure
1 (on back of this page). The third nut "B" does not enter the operation and
should not be disturbed.

Action - By Units - By R.C.O.C. Workshops

Amend Manual UC - F1 accordingly.

Lynn Eades 11-09-13 03:27

To finish the story; The nut on "B" being a castleated (sp?) nut,secured by a split pin. This castle nut backing the said thackery washer,which for those who may not know is a double looped spring washer.
The above info previously supplied to me, by both the thread starter and Doug Lavoie
(the forward two anchors have plain nuts (7/8" BSF) and are not drilled for split pins)

Good info to have, so thank you for posting Michael R.

Michael R. 11-09-13 16:42

7/8" spring washer
 
1 Attachment(s)
This Thackeray spring washer, as called for on the track adjuster lower rear of three bolts ... does anyone have a source for these in 7/8" ?
As a double coil spring washer, a similar item is common in the hydro line installation business, where the washer can compensate for wood components
swelling or shrinking. A different finish for sure. Any hydro linemen have a few spare?


All times are GMT +2. The time now is 18:48.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016