I am almost finished, i only have to do the electric wirring.
I think the overloaded it once.
Because of the melting from some wirres.
What i am thinking about and maybey you guy's can advise me.
At the bottom of the control box is a air intake.
At the generator i have a conection that blows a lot of air, during operation.
I am thinking of conecting this to the bottem of the control box, so it gets verry good ventilated.
Bad or good idea ?