Thanks Charlie
Mufflers are for sure on the list of things to do. You should see the parts piled up waiting for warm weather. That way they can be painted and installed. Before I can fit the mufflers I need to paint the asbestos heat sheilds I got and install them Then the NOS mufflers can go on then I can get the needed straight pipe cut to size. Then I need to get the electrical done so that I can run the machine. Wow my list is bigger all the time.
__________________
Jordan Baker
RHLI Museum,
Otter LRC
C15A-Wire3, 1944
Willys MB, 1942
10cwt Canadian trailer
|