Phase 2 - Week 7
Spent Weeks 4, 5 and 6 in Europe so nothing was done. However, this week we finished the final fitting of the tool boxes with their skins on. We also completed the spare tire braces and the tire holding bracket. See the attached pictures.
Regards,
Jim
PS Received the second gas tank in the mail and am off to the gas tank fabricator tomorrow morning for the repositioning of the filler tube. The tank I received had the tube on the edge of the tank instead of the top.
|