Phase 2 - Week 12
Got the bows and struts back from the fabricator last week and set about preparing them for installation. Welded tabs to each side of the bed so that we can bolt the bow legs to each. Welded nuts to washers and then welded them to the ends of each bow leg. Have bolted the struts to the bows for easier disassembly and storage. Will trim them after final assembly. Will finish by welding the bow braces (14") to the bows next week.
Was hot today...Well over 110F...
Regards,
Jim
PS What color should the cover for the frame be?
PPS Thanks, Mike, for the drawings!
|