Just a quick posting to say I visited the engineering works this morning, and they are part way through the job.
Both replacement sections to rear of the rails are fabricated and tacked in place, fish plates are bolted on, and two of the three minor crack repairs are completed. Well, actually there are two cracks & one area requiring patch repair. That one spot is on the transmission cross-member where someone had cut a jaggedy hole.
Things are on track for me gettting it back this Saturday!!!!!!
I have $10 that i'll bet I can't get a hire trailer for this Saturday.