View Single Post
  #2  
Old 18-08-14, 12:28
Darrin Wright Darrin Wright is offline
Registered User
 
Join Date: May 2003
Location: Albury/Wodonga Victoria
Posts: 606
Default carby linkage finished and stowage boxs

Apart from bike riding I did do a little work in the shed, got my 2 boys down to assist.
Cut and welded the cable end fitting on to the choke cable, fitted the cable correctly and tightened all the bolts.
These end fittings came from Mac's Auto and are for a dual carby set up, I just cut it in 1/2 and drilled the rods to suit the cable wire. One fitting is a left thread, but that is not a problem.

Also commenced the installation and drilling of holes in the rear shelf for the stowage boxes.
Working from the left, managed to get the 2 left boxes drilled and bolted into position and the large box location drilled. It still requires several coats of paint.

Installed the left front seat to the floor.
Attached Thumbnails
Aug 14 2 003.jpg  
Attached Images
   
__________________
1943 Ford GPW Jeep "Follow Me"
1943 MBT trailer
1943 Dodge WC-57 Command Car
1943 Chev C60L Army Cargo Truck
1941 LP2 VR 731 Bren Gun Carrier 3" Mortar Carrying

Under restoration:
1940 LP1 Bren Gun Carrier
194? 1 Ton Trl Ben Hur
1942 C15A with sunshine cabin

MVPA 31338
Reply With Quote