View Single Post
  #40  
Old 24-11-14, 20:34
Jerry Hill Jerry Hill is offline
Registered User
 
Join Date: May 2010
Location: Suffolk, UK
Posts: 46
Default The nose is finally welded

Last Friday and today Richard welded, welded and welded a bit more, today the nose has completed an important stage and is available for final assembly onto the truck.

Pic 1 shows the drivers side viewed from the inside and the many welds. The patch at the base is from an earlier life. The top panel is new.

Pic 2 shows the passengers side, the front panel was too ratty to re-use, so Richard cut out and welded the original headlamp bowl into an new piece of 2mm zintec, this was no small feat, as it was done without any heat distortion, the top panel is also new.

Pic 3 shows the centre section and the numerous welds. resulting in a rigid structure that fits the rest of the vehicle like a glove.

Pic 4 sorry the pic's sideways, but it shows what a good result we got from what was a sorry sight at the back end of September. The centre section is welded into a tight structure from new folded centre section pieces making it stiff and strong.

Before final fitting I've got to fit new woodruffe keys to the pedal cross shaft assembly, having obtained some excellent tight fitting key material late today, so that will get done and fitted shortly. Hopefully some panel fitting caulk will arrive tomorrow ready for the next stage later in the week.

Jerry
Attached Thumbnails
Bevprogress11092.jpg   Bevprogress12093.jpg   Bevprogress13094.jpg   Bevprogress14095.jpg  
Reply With Quote