Quote:
Originally Posted by Lynn Eades
Richard, I don't think they had to drill the lot. I think the holes were cast into the links. They just had to be finished. Still tricky. The track has to be the hardest part, IMHO.
|
The people that sold the tankette didn't build it, it was purchased in Lancashire along with all the drawings, tooling, patterns for casting and a spare hull.
And the vehicle although registered as built in the Twenties was built sometime between 2000-2010
The holes for the track pins were not cast in, instead they were drilled out on a sliding jig.