Thread: New UCW project
View Single Post
  #218  
Old 19-02-17, 22:42
Lynn Eades Lynn Eades is offline
Bluebell
 
Join Date: May 2003
Location: Tauranga, New Zealand
Posts: 5,541
Default

Looking good Petr. I believe there was 1/4" thick flat rubber gasket fitted between the dash panel and the drivers front plate. This was to assist in preventing failure of the speedo cable and electrical shorts. Also I think there was a dome nut on the bottom dash panel bosshead screw to make life easier on the fingers of your right hand.
See if the dash panel top cover will fit well, with the rubber spacing the dash panel out out.

Those lower engine cover rails are a great modification. I wonder why it took so long?
__________________
Bluebell

Carrier Armoured O.P. No1 Mk3 W. T84991
Carrier Bren No2.Mk.I. NewZealand Railways. NZR.6.
Dodge WC55. 37mm Gun Motor Carriage M6
Jeep Mb #135668
So many questions....

Last edited by Lynn Eades; 19-02-17 at 22:49.
Reply With Quote