| 
 
			
			Lynn
 The concrete floor will get poured in the spring.  I will be putting in floor heating as well. I’ve got all the tubes and styrofoam panels and rebar....lots and lots of rebar.  Speaking of rebar I added “L” pieces that go from
 The foundation wall I to the floor every two feet.  When the floor rebar goes in there will be a grid pattern spaced every two feet both lengthwise and widthwise.  This should greatly help keep the floor together for a long time and also keep foundation wall from leaning or the floor heaving.  However with the infloor heating frost should not be a concern.
 
				__________________Jordan Baker
 RHLI Museum,
 Otter LRC
 C15A-Wire3, 1944
 Willys MB, 1942
 10cwt Canadian trailer
 |