I treated the plywood on both sides with a water repellent sealer / stain . I have seen the plywood come apart because of water seeping in by the numerous screw and bolt holes in the roof in these old boxes . I also primed all the exposed metal before putting in the finishing plywood for the ceiling . Lesson learned from my first restoration.
__________________
44 GPW / 44 C-15-A Cab 13 Wireless 5 with 2K1 box X 2 /
44 U.C. No-2 MKII* /
10 Cwt Cdn Brantford Coach & Body trailer /
94 LSVW / 84 Iltis
|