it would make sence about nor needing the 4.2in mortar on the beaches for at least a week. if i was the planner i would hold back anything with about the 4.2in range and fill the ships with infantry, tanks, fuel and ammo. durring that first week or two the naval artillery would have been able to cover most of the area with the army artillery hitting farther inland. its just the role of that sized mortar was already being filled. just my opinion
__________________
44 GPW, 43 MB, 42 trailer, 43 cckw
44 MORRIS C8, M-3A1 SCOUT CAR
41 U/C, 42 U/C x 2, 44 U/C
42 6LB GUN
and the list keeps growing, and growing.... i need help LOL
|