The spacers lifted the crew stowage locker up above the rivets along the left side of the vehicle. There should also be a spacer under the smoke generator bin and the open topped bin on the right side. I just worked out the spacer thickness for the open topped bin as 1.25"
Yeah I know off topic once again.
__________________
Jordan Baker
RHLI Museum,
Otter LRC
C15A-Wire3, 1944
Willys MB, 1942
10cwt Canadian trailer
|