View Single Post
  #20  
Old 30-11-14, 13:07
RichCam's Avatar
RichCam RichCam is offline
Registered User
 
Join Date: Jun 2007
Location: Huntsville, Ontario
Posts: 346
Default Wire 5 Cab Refurbishment

Work is continuing to proceed on the Wire 5 restoration. Unfortunately, some of the smaller component work is tedious and can't be rushed. It is frustrating but not unexpected to have the smaller fasteners and components to be rusted and frozen in place. It is impossible to heat with a torch and put an air ratchet to them so the cab windows, side curtains and doors are taking longer than expected.
Front windows are now in with new glass. I cut a spare set for anyone that is interested. Side curtains have been rebuilt with new Lexan panels and door handle portals. Seats have been installed along with round upper hatch hip padding.
We are painting the doors this week and working on the dash. With the newer 250 engine, I have a 12V temperature and oil pressure gauge to contend with. The dash is circular gauge like the later Fords.
More updates soon, feel free to comment.
Attached Thumbnails
IMG_2805.jpg   IMG_2806.jpg   IMG_2807.jpg   IMG_2808.jpg   IMG_2809.jpg  

__________________
Richard Hatkoski
1940 CMP C11 C-8 (Restoring)
1940 CMP C11 F-15A (Parts)
1941 CMP C12 C-15A (Parts)
1942 CMP C13 F-60S Dumper (Restoring)
2 x 1941 CMP C12 F-GT (Storage)
194? CMP C13 C-60X (For Sale)
Reply With Quote