View Single Post
  #5  
Old 27-08-08, 00:11
Stewart Loy Stewart Loy is offline
T-16, C15A
 
Join Date: Feb 2003
Location: Out in the woods near Woodstock, Ontario, Canada
Posts: 881
Default Production Schedule

Mike,

I suspect that once I get the tarp and fiddle with it a bit it will likely be mid-October. I am trying to get a slow period in the canvas makers schedule to see if that helps out the cause.

The box cover sample has ropes on the outside perimeter, and some canvas straps inside.

Here is a picture of what it will likely look like.

My box measures 82.5 inches long by 78.38 inches long, all welded. Can I get a sampling of sizes of other boxes? Are the Ford one the same, or will the Chevy guys be the only ones with new tarps?



Stewart




Quote:
Originally Posted by Gunner View Post
Hi Stu:

When are you going to production- cash flow drives the question!

Rope or springs and metal tabs for attaching to the box?

Mike
Attached Thumbnails
tarp sample.jpg  
Reply With Quote