View Single Post
  #443  
Old 26-11-20, 21:59
David Dunlop David Dunlop is offline
Registered User
 
Join Date: Feb 2006
Location: Winnipeg, MB
Posts: 3,391
Default

Another good afternoon’s work today.

The two Screw-Eyes above the Access Door Assembly were cleaned and reinstalled. The room to access the hex nuts inside the upper chassis frame is limited, so best to put these items back while the Blower Motor is off the Door. One can simply slide the hex nut up the inside of the upper chassis frame with a finger until it is centred in the hole and then screw insert the Screw-Eye.

I did not run the hex nuts all the way home on these two Screw-Eyes. They were both able to move freely in their holes in the front panel initially and it made sense to allow them to do that as they can shift with any bending of the Connector Cable they support between the Receiver and Sender. The inside diameters of both of these Screw-Eyes were perfect and I want to keep them that way. By comparison, somebody over tightened the Screw-Eye on the Supply Unit to the point the open end of the eye closed up on the loop enough you can no longer thread the Connector cable through it. One of the things to address when I get to the Supply Unit.

Once the Screw-Eyes were out of the way, I reinstalled the Blower Assembly and lacquered down the hardware. The power feed has not yet been resoldered in place. That will be the next bit of work.

Lastly, I reinstalled the restored COVERS, Metal, Blowers, Electric with the cable clip holding the Power Feed Cable to the door once again, and then lacquered that hardware.

It is nice when things can start to go back on a project.

David
Attached Thumbnails
WS No. 52 Sender 61.JPG   WS No. 52 Sender 62.JPG   WS No. 52 Sender 63.JPG  
Reply With Quote