Restoring the interior of the box of the Wire 5 project
More pictures.
On the left front wall , again a mike and phone holder for the 19 set.Here will go the table for the 19 set .
On the left sidewall again the little shelf, the fire extinguisher bracket and the file or message holder underneath the field phone connections and ground post.
There is a little telephone and message table that will be going here tomorrow.
It is the cypher clerk position. He was sitting sideways as can be seen by the holes for the seat base in the metal floor .
On the right rear backwall nothing yet. Metal storage shelves will go here eventually when i find or fabricate them.
On the left backwall the generator cabinet venting doors. This is where the gen cabinet will go tomorrow.
__________________
44 GPW / 44 C-15-A Cab 13 Wireless 5 with 2K1 box X 2 /
44 U.C. No-2 MKII* /
10 Cwt Cdn Brantford Coach & Body trailer X 2 /
94 LSVW
Last edited by Robert Bergeron; 10-12-15 at 02:31.
Reason: spelling
|