Hi all,
Half a day's work today.Odds and ends.
Made a Cypher clerk table, a little border around the right
wheel well shelf and lined the rear door with plywood.
Re installed the BO curtain holder over the rear door.
Applied silicone to all the screw heads on the roof and around the windows to prevent water infiltration and damage.
Tidied up and started making inventory of my Wireless equipment after a nice chat with my friend Michel , a new member on MLU.
The Wireless No 19 installation poster on the wall over the wireless operator' s table is a gift from Jon also on MLU.
Stay tuned , same time same channel.