View Single Post
  #23  
Old 28-12-17, 06:47
James Y James Y is offline
Registered User
 
Join Date: Aug 2013
Location: Edmonton, Alberta, CDN
Posts: 123
Default

A little more progress, attached the tabs to hold the frame to the p/u box and welded the tabs to the tubing. Added the side pieces that the flat steel side pieces go over the canvas to secure the canvas tight to the frame.
Attached Thumbnails
IMG_3806.jpg   IMG_3811.jpg   IMG_3816.jpg   IMG_3819.JPG   IMG_3820.JPG  


Last edited by James Y; 28-12-17 at 06:53.
Reply With Quote