Hi all, a bit closer on the mortar carrier. I've fabricated the heat shields for the driver/engine bay. The originals were filled with asbestos, so I filled mine with compressed fibre cement sheeting which should do the job very well. The engine is ready to be installed for the last time. As you can see I did a trial fitting again to mark the floor for the engine oil change plate. That is now made and ready. All linkage is installed and adjusted. I just need to make my tailshaft connections for the final drive.
I'll keep you posted
Colin.
|