Finished up the sand channel mounts. The threaded portion was made from turning down 1” diameter rod to 7/8”. Then the inside was bored out and threaded to 5/8” NC. The base was 1/4” plate 3” wide. Thankfully 3” square tube with 1/4” wall thickness is available. It saved some time cutting these out with a Zip disk compared to trying to get consistent bends 1/4” plate. These will eventually get welded to the hull. The originals were all cut off.
__________________
Jordan Baker
RHLI Museum,
Otter LRC
C15A-Wire3, 1944
Willys MB, 1942
10cwt Canadian trailer
|