I have been busy making the track return roller hubs. As usual, I have been using materials that are locally available, rather than ordering specific sized materials, so a little bit of adaption is required. The main hub starts as a piece of tube cut and machined to length, then a flange is welded in each end of the tube and then set on the lathe so that the rings can be bored out to suit the centre bearing housing. This bearing housing is then welded in place. A ring is then welded on to the outside of one end of the tube for two reasons. Firstly to give the impression that the material is thicker and closer to the originals dimensions and secondly to give the polyurethane tyres something to bond to when I cast them in place. This assembly is the reset on the lathe and bored out to the bearing diameter size and correct internal lengths. A separate ring is then welded on to the opposite end of the hub, for the same reasons as the first. Reset on the lathe and then again faced to the correct lengths. Each time the hub is reset in the lathe, for each operation, it has to be adjusted so that the assembly rotates true to within 0.02mm, so you can see its a time consuming process.
Attached Thumbnails
DSC04625.jpg   DSC04626.jpg   DSC04628.jpg   DSC04633.jpg  
__________________
1950 Land Rover series 1
1967 Land Rover series 2A LWB
1986 Land Rover series 3 SWB
1938 DKW SB200
1944 DKW NZ350-1
1967 Ural K750 sidecar outfit
1944 VW Kubelwagen KDF82
1942 Steyr 1500A
1944 Morris C8A
1943 Chevrolet CMP8A HUP?
194? Bedford QL
Reply With Quote