Evening All,
A week of lock down done and I heard on the radio it could last for 13 weeks, so progress will slow right down but it will continue until the materials run out.
I have finished the mould for the drive wheels, it's made on the same principle as the return roller mould but bigger. I am worried that because of the amount of polyurethane required, about 6.5 litres, it will have problems filling from a single pour and although I am loth to use a double pour, I have constructed the mould with two pouring holes.
Jon
__________________
1950 Land Rover series 1
1967 Land Rover series 2A LWB
1986 Land Rover series 3 SWB
1938 DKW SB200
1944 DKW NZ350-1
1967 Ural K750 sidecar outfit
1944 VW Kubelwagen KDF82
1942 Steyr 1500A
1944 Morris C8A
1943 Chevrolet CMP8A HUP?
194? Bedford QL
|