View Single Post
  #11  
Old 22-08-18, 14:53
rob love rob love is offline
carrier mech
 
Join Date: Feb 2003
Location: Shilo MB, the armpit of Canada
Posts: 7,521
Default

The first contract with the Fred Flinstone wheel was made by Manac. The second contract with the dual wheels was made by DEW engineering. The DEW chassis were, ad Ed has mentioned, the M104CDN4 model.

Photo of the landing leg from the part manual attached.
Attached Thumbnails
DSC01313.jpg  
Reply With Quote