I am going to fabricate the bearing housings, weld and machine the excess off after completion. I need two more for the other tank but will wait until I decide what type of drive system will be suitable. after I weld in the boss, I will be able to lathe the outside perimeter down to size. The holes that are in the dish at the moment will be machined off and new holes put in the correct locations.
|