MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 12-01-12, 08:19
Philliphastings's Avatar
Philliphastings Philliphastings is offline
Registered User
 
Join Date: Feb 2004
Location: Sunny Australia
Posts: 528
Default Scout carrier progress

I have been chipping away a little more with the scout Carrier and attempted to straighten the back lower armoured panel and left footstep with my portapower. It had no practical effect other than to bow the armour to a worrying degree. after I let the pressure off it just snapped back to where I started and then proceeded to laugh at me. I'm now thinking gentle heat will be required !

Some of the smaller brackets on the backplate were bolted on in the customary manner but of interest were the two rope horn brackets, one of which was rivetted on neatly and the other was attached with coack bolts which were welded over on one side and appeared at first to be rivetted on. Both brackets had to be removed to be straightened and repaired and to deal with nasty rust scale which had begun to expand between the plates - all gone and sanitised now...
Attached Images
File Type: bmp back plate.bmp (99.4 KB, 86 views)
__________________
Ford GPW Jeep USMC Ambulance
Willys MB Jeep
Daimler Ferret Mk 1
Daimler Ferret Mk 2
Land Rover S2A Field Workshop
Land Rover S3 FItted For Radio x2
Land Rover Perentie GS (SASR)
International No 1 Mk 3 2.5 Ton 4x4
International No 1 Mk 4 2.5 Ton 4x4

Last edited by Philliphastings; 12-01-12 at 08:35. Reason: Further info
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 14:17.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016