MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Restoration Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 12-05-14, 11:02
Private_collector's Avatar
Private_collector Private_collector is offline
Tony Baker
 
Join Date: Oct 2010
Location: Wide Bay, QLD, Australia.
Posts: 1,819
Default Quote for reassembly of Flathead V8

You may recall I recently contacted an engineering firm for a quote to reassemble my Ford Sidevalve engine. That phonecall was Friday, and as they had promised, I got a return call today with their quote. Firstly, let me say the price indicted was not a firm amount, it was advised to be a rough estimate, and was based on similar rebuilds they had done in past. Playing devils advocate, I think they may have been struggling with the concept that this is effectively a new engine. As the conversation progressed, I clarified that a number of tasks associated with a rebuild are not applicable here. Things such as line boring mains, testing & repairing con rods where applicable, and machining valve seats were spoken about. I could confirm these jobs were not required, and although they said this could decrease the cost by a bit, I can't help but feel the estimate of $3400 to put the engine together is a little harsh! I know of two people who have had work done there, and it has been exceptionally good standard in both cases. There is no doubt I would be happy with the outcome, but at 3k+, that is more than I wish to part with.

Perhaps I should be writing a list of what parts are brand new, and document the tasks which will not be required in this assembly. I initially hoped that my indicating 'everything is new' would allow any prospective firm to quote for what is in essence a very easy build. That said, I know for a fact that in this case it was not fully understood that the block itself was absolutely ununsed & literally brand new. Not surprising when you consider that not many (if any others at all) of the French manufactured blocks/engines have made their way to Australia. I should imagine that after clarification of the above, the final cost of reassembly would be very much reduced from the estimate, but can I afford to take that chance? Not really! Even if the invoice was 1/2 the amount, that is more than I had expected under the circumstances.

Guess I will get further quotes. I'll also do my best to ensure that it is fully understood that no internal components require repair or reconditioning in any way.

Ho, hum!
__________________
Ford CMP, 115" WB,1942 (Under Restoration...still)
Medium sized, half fake, artillery piece project. (The 1/4 Pounder)

Last edited by Private_collector; 12-05-14 at 11:08.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 22:41.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016