MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #34  
Old 16-01-16, 03:28
super dave super dave is offline
Dave Good
 
Join Date: Dec 2003
Location: Onoway, Alberta, Canada
Posts: 684
Default

Also I got a couple of the flex hoses made up from an example and installed from the oil cooler bypass valve to the lines on the frame, Its nice that they had the fittings for it as it was British thread. As for the lengths the parts book says 27" overall length for the long one and 23" for the shorter one. In installing them I would recommend going to 24" overall length for the shorter one as the crimp on ends are a little longer than the originals and give a little less to the flex points so a little longer on the shorter one will have a better curve out of the fittings, Just my 2 cents.



Next in line will be the conduit and wiring, Will be nice to get that over with
Attached Images
File Type: jpg DSC_0029.jpg (54.8 KB, 17 views)
File Type: jpg DSC_0030.jpg (75.1 KB, 35 views)

Last edited by super dave; 17-01-16 at 19:23.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 23:07.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016