MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #25  
Old 10-02-12, 08:19
Lew Skelton Lew Skelton is offline
Lew Skelton
 
Join Date: Mar 2008
Location: Feilding, New Zealand
Posts: 164
Default some recent action

Iv'e put in a couple of solid weeks on the carrier, started by replacing the rear panel that had been cut out, then onto replacing the bit that was cut out from behind the driver, the plate was 6mm so isnt a perfect size match so have feathered it in where needed, gutted out all the drivers controls and took off the tracks to get at the brakes. Brakes were all clean and tidy, lots of lining left so sent into the brake shop for a tidy up of the drums.
Attached Images
File Type: jpg DSC01010.jpg (43.2 KB, 72 views)
File Type: jpg DSC01012.jpg (51.6 KB, 68 views)
File Type: jpg DSC01013.jpg (57.7 KB, 74 views)
File Type: jpg DSC01019.jpg (60.4 KB, 72 views)
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 01:42.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016