![]() |
#24
|
|||
|
|||
![]()
Hi Alex
I verified some factgory pictures of early complete and clean cab 11 and 12 All the cab 11 Ford and Chev DO HAVE the 3 bolts installed...... ...but remember.... at the factory the whole nose assembly was put together on a separate jig then lowered on the frame which already had the motor and the radiator installed...... so at the factory the front most of the 3 bolts was installed. I am sure that whenit was serviced in field unit that front bolt disappear as it would be almost impossible to re install wthout caged nuts. On the cab 12 Chev pictures the rear 2 bolts are replaced by large 5/16 recessed screws instead of bolts AND the front hole is left empty..... May not be gospel but that is what I observed. Bob C.
__________________
Bob Carriere....B.T.B C15a Cab 11 Hammond, Ontario Canada |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
2015 at the Hammond Barn | RHClarke | The Restoration Forum | 113 | 31-12-15 21:00 |
2013 at the Hammond Barn | RHClarke | The Restoration Forum | 85 | 05-01-14 23:29 |
2011 at the Hammond Barn | RHClarke | The Restoration Forum | 328 | 01-01-12 21:09 |
2009 at the Hammond Barn | RHClarke | The Restoration Forum | 322 | 02-01-10 16:05 |
Hammond Barn Visit | Wpns 421 | The Softskin Forum | 1 | 15-12-09 03:17 |