MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #19  
Old 10-08-09, 12:18
ron ron is offline
Registered User
 
Join Date: Jan 2006
Location: gold coast qld australia
Posts: 1,294
Default Graeme,

Hi Graeme,
Thanks for posting that pic, You just beat me to the punch, I have a copy of the same pic, the way that I understand it was the track link was cast undersize and them reamed to size, at first thought it might seem like a big job, but just look at the small pile of links on the side of the mill, that man would ream all of them and many more in a full days work,first get the track links cast and then set to and ream them out one at a time, the pyrimids were built one block at a time, just put in a days work on a mill with the right cutters,and you will be supprised just how much work you can get through you just need a quick action jig to hold the work,anyway thats my two bobs worth if I need any more new track I will not hesitate to make it,
Regards to you all Ron
__________________
Ron Winfer
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 03:24.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016