MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #7  
Old 16-05-12, 10:42
Lynn Eades Lynn Eades is offline
Bluebell
 
Join Date: May 2003
Location: Tauranga, New Zealand
Posts: 5,541
Default Andrew

The idea is to mix and match so that you end up with two (stretched to take up the wear) tracks the same length, with the same number of links. Usually you would need joining pins that are slightly longer to allow for the split pin and washer. By the way I think the pins should be fitted so that the head is toward the hull.
I think david is correct for the Universal carrier, That a total of six links can be removed from the original 168, before the track is deemed to be "worn out"
I would have guessed the T16 , with the longer track, might be able to have more removed. I don't know.
Maybe (they) revised the allowable wear limit back to a lesser amount?
__________________
Bluebell

Carrier Armoured O.P. No1 Mk3 W. T84991
Carrier Bren No2.Mk.I. NewZealand Railways. NZR.6.
Dodge WC55. 37mm Gun Motor Carriage M6
Jeep Mb #135668
So many questions....
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 23:09.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016