MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Restoration Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 04-02-14, 12:55
Darrin Wright Darrin Wright is offline
Registered User
 
Join Date: May 2003
Location: Albury/Wodonga Victoria
Posts: 606
Default Too hot to work

Brief update from the weekend, due to the hot weather minimal work got done and no pics.

I have removed and drilled the diff fill plug and have braze welded in some steel tubing to make the diff breather pipe. Still have to finish the tubing/hose and make a P clamp to secure it to the rear armour plate.
Straightened the rear mudguards and tried to square them up.
Straightened and corrected the hinges of 2 of my rear stowage bins, so now the lids close/open easily. This was just a matter of pulling in the hinge so that it aligned with the remainder of the hinge and was closer to the body of the box.
Done some work on the Jeep & cleaned it in preparation for going to Corowa.
__________________
1943 Ford GPW Jeep "Follow Me"
1943 MBT trailer
1943 Dodge WC-57 Command Car
1943 Chev C60L Army Cargo Truck
1941 LP2 VR 731 Bren Gun Carrier 3" Mortar Carrying

Under restoration:
1940 LP1 Bren Gun Carrier
194? 1 Ton Trl Ben Hur
1942 C15A with sunshine cabin

MVPA 31338
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 09:50.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016