MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Restoration Forum

Notices

Reply
 
Thread Tools Display Modes
  #1  
Old 25-10-17, 20:48
RHClarke's Avatar
RHClarke RHClarke is offline
Mr. HUP
 
Join Date: Aug 2003
Location: Ottawa Area
Posts: 2,327
Default Uncanny

Quote:
Originally Posted by rob love View Post

A better idea is to take those same two sea cans, space them apart, and run suitable roof trusses. It will keep the cans dry, and give you a storage space in the middle. That said, putting a roof on will be expensive and time consuming, which kind of defeats the reason for using sea cans in the first place.

I couldn't agree more with the first and second sentences. As for the third sentence, it cost me around $300 to put the roof on my two sea cans as shown in the pic below. The majority of the cost was for the tin and screws required. The wood came from a neighbour's deck, which I repurposed into sturdy trusses.

If I were to do this again, I would increase the span between the cans. Right now, the Pilot Model HUP (in pieces) resides in this quite dry and spacious home. The front and back are now covered with mod tents, as seen in the second shot - the front rolls up on a pulley system. Ultimately, I cannot but sing the praises of sea cans and sea can shelters.
Attached Images
File Type: jpg seacans.jpg (361.1 KB, 6 views)
File Type: jpg DSC06629002res.jpg (152.0 KB, 6 views)
__________________
RHC
Why is it that when you have the $$, you don't have the time, and when you have the time you don't have the $$?

Last edited by RHClarke; 25-10-17 at 20:55.
Reply With Quote
  #2  
Old 25-10-17, 22:19
maple_leaf_eh maple_leaf_eh is offline
Terry Warner
 
Join Date: Mar 2004
Location: Shouting at clouds
Posts: 3,155
Default

Quote:
Originally Posted by RHClarke View Post
....

If I were to do this again, I would increase the span between the cans. Right now, the Pilot Model HUP (in pieces) resides in this quite dry and spacious home. The front and back are now covered with mod tents, as seen in the second shot - the front rolls up on a pulley system. Ultimately, I cannot but sing the praises of sea cans and sea can shelters.
Suggest two layers of modular tentage if possible. I was inside my shelter when a rainstorm outside. I was not surprised that water was dripping off the insides surfaces of the somewhat weathered fabric. A second layer of canvas would give a form of run-off protection.
__________________
Terry Warner

- 74-????? M151A2
- 70-08876 M38A1
- 53-71233 M100CDN trailer

Beware! The Green Disease walks among us!
Reply With Quote
  #3  
Old 26-10-17, 00:39
rob love rob love is offline
carrier mech
 
Join Date: Feb 2003
Location: Shilo MB, the armpit of Canada
Posts: 7,609
Default

Two layers of canvas is fine, but only if you leave a space between them. Otherwise, any leakage through the first one will cause the second one to rot.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
2015 at the Hammond Barn RHClarke The Restoration Forum 113 31-12-15 22:00
2014 at the Hammond Barn RHClarke The Restoration Forum 63 01-01-15 22:50
2013 at the Hammond Barn RHClarke The Restoration Forum 85 06-01-14 00:29
2012 at the Hammond Barn RHClarke The Restoration Forum 149 01-01-13 02:27
2011 at the Hammond Barn RHClarke The Restoration Forum 328 01-01-12 22:09


All times are GMT +2. The time now is 10:16.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016