MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Restoration Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #25  
Old 16-12-20, 08:59
Lionelgee's Avatar
Lionelgee Lionelgee is offline
Lionel G. Evans
 
Join Date: May 2009
Location: Bundaberg - Queensland, Australia
Posts: 742
Default

Hello All,

It has been months since my last update on the shipping containers. This was mostly brought about by some issues with the construction of the pad. The original shape of the land was made up with a series of raised mounds and valleys to allow drainage for the previous owner's citrus trees. Instead of cutting the ground out level we did a mix of cut and fill. The fill had a higher clay content and spewed up through the surface of the road-base material when being levelled with machinery.

Some months passed and more road-base was brought in and a similar thing happened. The more the road-base was worked the more the clay fill spewed up through the surface. I called a halt to operations.

Weeks passed by and I grew increasingly uncomfortable about where the shipping containers were stored. They were temporarily positioned right alongside of the water course's bank. This is in a lower area which frequently overflows when the creek rises up. It is also now the "wet season" here.

Having visions of a couple of shipping containers bobbing their way down the flooded creek I decided to act. I ordered a mobile crane and the shipping containers were carried over to the pad and lowered down onto the 160 mm high concrete blocks under each corner.

Now the next time it rains I can breathe a sigh of relief. Also, tomorrow I can start mounting the particle board for the pallet rack shelving. Once this is all done I can move all the stuff that is blocking ready access to the shelves in my main shed.

I am very happy that the shipping containers are in their designated place - at last

Future plans: I have engineer design plans being drawn up for a gable roof to span between the containers. The plan includes proper concrete anchor points into the ground. I had a soil test performed to allow the engineer to sort out the correct depth and diameter for the anchor points. After spending some time in the containers today - it is Summer here - a couple of whirlybirds are on the immediate agenda. The roof spanning the containers is a long term goal. . Depending upon how many roof trusses are needed, the roof will be done by covering the span between two roof trusses at a time - to form a series of completed roof "panels". The roof top ventilators (whirlybirds) are a much more immediate item.

Kind regards
Lionel
Attached Images
File Type: jpg Creek Containers.jpg (723.0 KB, 3 views)
File Type: jpg The Pad.jpg (467.6 KB, 2 views)
File Type: jpg Containers on Pad.jpg (403.5 KB, 3 views)
__________________
1940 Chevrolet MCP with Holden Built Cab (30 CWT).
1935 REO Speed Wagon.
1963 Series 2A Army Ambulance ARN 112-211
Series III ex-Military Land Rovers x 2

Last edited by Lionelgee; 16-12-20 at 09:18.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Wanted: Shipping container (Pelican case) as recently sold on CADC rob love For Sale Or Wanted 7 01-08-21 17:37
Cab 13 Storage Bag Keith Orpin The Softskin Forum 54 09-01-21 22:02
Mk 2 Storage bin. stephen crowhurst The Carrier Forum 6 10-06-19 17:21
Storage Box ID? Richard Coutts-Smith The Softskin Forum 8 28-10-17 09:00
Wanted: Used sea container RHClarke For Sale Or Wanted 28 15-07-12 00:49


All times are GMT +2. The time now is 06:02.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016