Im starting to do the rebuild on my CMP Wire-3 box. Its the standard looking box as found on the 15cwt CMP.

Has anyone ever seen any off the shelf items that would be the same as the hinges for the tail gate. Or does anyone know of a place that could make some for me?
__________________
Jordan Baker
RHLI Museum,
Otter LRC
C15A-Wire3, 1944
Willys MB, 1942
10cwt Canadian trailer
Reply With Quote
  #2  
Old 07-12-16, 06:06
Lynn Eades Lynn Eades is offline
Bluebell
 
Join Date: May 2003
Location: Tauranga, New Zealand
Posts: 5,534
Default

Sample picture maybe Jordan?
__________________
Bluebell

Carrier Armoured O.P. No1 Mk3 W. T84991
Carrier Bren No2.Mk.I. NewZealand Railways. NZR.6.
Dodge WC55. 37mm Gun Motor Carriage M6
Jeep Mb #135668
So many questions....
Reply With Quote
  #3  
Old 07-12-16, 17:30
Bob Carriere Bob Carriere is offline
Moderator
 
Join Date: Mar 2003
Location: Hammond, Ontario
Posts: 5,203
Default Ah come on Jordan......

After all the repros you have done don't tell me you are going soft and are looking for a Canadian Tire part number.....!!!

On a more serious note...... Grant will no doubt jump in ..... he is/has done some for his 20cwt trailer he is rebuilding..... a bit tedious but quite possible to make....in fact Grant has reproduced the whole trailer box.

Cheers
__________________
Bob Carriere....B.T.B
C15a Cab 11
Hammond, Ontario
Canada
Reply With Quote
  #4  
Old 07-12-16, 17:53
Jordan Baker's Avatar
Jordan Baker Jordan Baker is offline
Moderator
 
Join Date: Feb 2003
Location: Hamilton, Ontario, Canada
Posts: 4,008
Default

I look forward to seeing what Grant had come up with.
__________________
Jordan Baker
RHLI Museum,
Otter LRC
C15A-Wire3, 1944
Willys MB, 1942
10cwt Canadian trailer
Reply With Quote
  #5  
Old 12-12-16, 16:22
Grant Bowker Grant Bowker is offline
Registered User
 
Join Date: Jul 2006
Location: Ottawa, Canada
Posts: 2,288
Default

I was working to make hinges for the 15 cwt trailer rescued from the Smiths Falls scrapyard as pretty much the complete box needed rebuild. Some of the hinges made are shown. There were variations in stock size and length depending on location and use but all were made the same way.
Attached Thumbnails
upper rave hinge 1.jpg   upper rave hinge 2.jpg  
Reply With Quote
  #6  
Old 12-12-16, 16:27
Grant Bowker Grant Bowker is offline
Registered User
 
Join Date: Jul 2006
Location: Ottawa, Canada
Posts: 2,288
Default Hinge jig

The jig used to bend the hinges was made from scrap bits of angle, rod and plate welded (crudely) together. The photos show the jig and the bending sequence scribbled on some wood that has probably since been fed to Lucifer. The bending had to take place in phases as I couldn't work fast enough the do the full bend in one heating of the stock. I was using an oxy-acetylene torch for the heating. If you have access to a forge, it might work better.
Attached Thumbnails
hinge jig 1.jpg   hinge jig 2.jpg   hinge jig 3.jpg   hinge jig 4.jpg   hinge jig 5.jpg  

Reply With Quote
  #7  
Old 12-12-16, 16:35
Grant Bowker Grant Bowker is offline
Registered User
 
Join Date: Jul 2006
Location: Ottawa, Canada
Posts: 2,288
Default

When I was looking for heavy gauge tube/pipe for the stationary part of the hinge on the trailer body I realized there is an alternate approximation of the hinge possible. You could weld a suitable length of pipe to your flat strap, dress the weld and not have a terrible representation without any bending. The pipe I found suitable was 1/2" schedule 80. The schedule 80 has heavier walls than the common schedule 40 so is both stiffer and a better fit on 1/2" rod. I haven't made any hinges this way but photos show the idea and the fit of rod within pipe.
Attached Thumbnails
sched 80 mockup2.jpg   sched 80 half.jpg   sched 80 mockup.jpg  
Reply With Quote
  #8  
Old 12-12-16, 19:17
Jordan Baker's Avatar
Jordan Baker Jordan Baker is offline
Moderator
 
Join Date: Feb 2003
Location: Hamilton, Ontario, Canada
Posts: 4,008
Default

Awesome, thanks for the pictures. That is something I can easily rig up.

Im just curious on the actual process. Do you fix the jig in a vice, then insert the metal strap in from the top and flush with the bottom edge of the angle iron? Heat and bend as you until the strap is now against the long side of the angle iron?

Is the diameter of the rod on the jig the same diameter as the finished inside diameter of the hinge?
__________________
Jordan Baker
RHLI Museum,
Otter LRC
C15A-Wire3, 1944
Willys MB, 1942
10cwt Canadian trailer
Reply With Quote
  #9  
Old 13-12-16, 00:18
Grant Bowker Grant Bowker is offline
Registered User
 
Join Date: Jul 2006
Location: Ottawa, Canada
Posts: 2,288
Default

The jig was in the vice. I preheated the hinge stock before inserting it as you described. My thought was that I would limit the heat getting into the jig to reduce distortions. Most hinges took a second heating.
The jig rod was the same size as the hinge rods but to ensure a bit of clearance I did run a 33/64" drill down the barrel of the freshly made hinges. some didn't need any material removed, some did.
Reply With Quote
  #10  
Old 13-12-16, 00:36
Jordan Baker's Avatar
Jordan Baker Jordan Baker is offline
Moderator
 
Join Date: Feb 2003
Location: Hamilton, Ontario, Canada
Posts: 4,008
Default

Ok thanks. Ill come up with my own jig. Looks to be simple enough.

I also found this link for hand forging this type of strap hinge. I know for our use, all the hammering marks would not be correct.

http://www.fao.org/docrep/009/ah637e/AH637E21.htm
__________________
Jordan Baker
RHLI Museum,
Otter LRC
C15A-Wire3, 1944
Willys MB, 1942
10cwt Canadian trailer
Reply With Quote
  #11  
Old 25-02-17, 01:12
Jordan Baker's Avatar
Jordan Baker Jordan Baker is offline
Moderator
 
Join Date: Feb 2003
Location: Hamilton, Ontario, Canada
Posts: 4,008
Default

I found some time this afternoon to make up my hinge jig. Thanks for the pictures.
Attached Thumbnails
image.jpg  
__________________
Jordan Baker
RHLI Museum,
Otter LRC
C15A-Wire3, 1944
Willys MB, 1942
10cwt Canadian trailer
Reply With Quote
  #12  
Old 25-02-17, 11:49
Lynn Eades Lynn Eades is offline
Bluebell
 
Join Date: May 2003
Location: Tauranga, New Zealand
Posts: 5,534
Default

Jordan, over here we can buy a bit of steel from the steel suppliers with the rolled hinge end on it. My boss bought some the other day. Much cheaper than making them he said. Just a thought.
__________________
Bluebell

Carrier Armoured O.P. No1 Mk3 W. T84991
Carrier Bren No2.Mk.I. NewZealand Railways. NZR.6.
Dodge WC55. 37mm Gun Motor Carriage M6
Jeep Mb #135668
So many questions....
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Wanted: crew door hinges Jason Linders For Sale Or Wanted 5 16-08-15 00:45
Carrier hinges Ben The Carrier Forum 7 02-07-13 20:04
For Sale: Carrier hinges Ben For Sale Or Wanted 8 29-06-13 00:05
Hinges, Mk1 British ins panel for trade! kevin powles The Carrier Forum 0 03-09-08 01:20
CMP 13 Cab Hinges Wanted Bruce Parker (RIP) For Sale Or Wanted 2 01-09-05 00:56


All times are GMT +2. The time now is 22:36.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016