MLU FORUM  

Go Back   MLU FORUM > GENERAL WW2 TOPICS > The MLU Sappers Mess

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 03-03-08, 23:52
sapper740's Avatar
sapper740 sapper740 is offline
Derek Heuring
 
Join Date: Oct 2004
Location: Corinth, Texas
Posts: 2,018
Default Expedient bridging

I barely touched the subject of expedient surfaces in my thread on that subject as I didn't want to overwhelm...or bore anybody with the plethora of surfaces available in WWII. I will be returning to that post time and again to present a fuller discourse on that subject. Today I want to ever so lightly touch on bridging which is a study unto itself. We are all familiar with the concept of spanning a gap above the surface (Bailey bridging) and spanning a gap by floating upon it using FBE (Folding Boat Equipment) which was often used in rafting across a waterway and pontoon floats, both inflatable and rigid hulled for treadway bridges. I'm using the title "Expedient Bridging" as a lead in to some interesting pictures I have where none of the aforementioned equipment is used. Sometimes Engineers had a field problem concerning a gap to be crossed with no or insufficient bridging kit available. The boss said they got to get across so here are some field solutions:

First pic: LVTs as pontoons in the South Pacific
Second pic: local fishing boats as pontoons, a German solution in Norway
Attached Images
File Type: gif Bridge on LVTs.gif (181.5 KB, 120 views)
File Type: jpg bridging expedient Norway.jpg (38.4 KB, 120 views)
__________________
Quis custodiet ipsos custodes?
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 17:05.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016