MLU FORUM  

Go Back   MLU FORUM > GENERAL WW2 TOPICS > The MLU Sappers Mess

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 10-05-08, 16:03
sapper740's Avatar
sapper740 sapper740 is offline
Derek Heuring
 
Join Date: Oct 2004
Location: Corinth, Texas
Posts: 2,018
Default Engineers and RR track destruction.

Previously, the only method I had seen of a retreating army destroying track was of Engineers labouriously laying explosive charges. A time consuming process, time which the Engineers didn't always have. A quicker method I have seen was that of a ripper blade attached to the rearmost train car which tore the ties in half and spread the rails apart. The damage left by this method was minimal as the rails were left straight and the ballast mostly undisturbed. A Rail Road Company would be able to restore the tracks quite quickly. Apparently the U.S. Army made note of this and came up with a better way to quickly demolish railway tracks with explosives by utilizing a purpose built CCKW 352 which ran on the tracks and deposited charges. The resulting blast would deform the rails making restoring the rail line much more difficult.

CHIMO! Derek.
Attached Images
File Type: gif Copy of CCKW 352 explosive layer on tracks.gif (109.5 KB, 130 views)
__________________
Quis custodiet ipsos custodes?
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 17:30.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016