MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 29-11-08, 17:53
Geoff Winnington-Ball (RIP)'s Avatar
Geoff Winnington-Ball (RIP) Geoff Winnington-Ball (RIP) is offline
former OC MLU, AKA 'Jif' - sadly no longer with us
 
Join Date: Feb 2003
Location: Toronto, Ontario, Canada
Posts: 5,400
Default

Quote:
Originally Posted by RichardT10829 View Post
wonder why they would charge so much for a cast set ? am I naive in thinking you only need one good track link to make a pattern, then the metal from the old links are melted down plus some extra bits to account for lost material in the smelting process you can drill the pin ways yourself iwht a good pillar drill no ? my thoughts were if you are going to make new tracks you could CAD a design to incoroporate track pads for the road to make them last a touch longer .
Richard,

You're right, casting new track links is the easy part, albeit they have to be hardened. The difficult (and expensive!) part is forging/machining/hardening track pins.

Secondly, yes, I suppose one could make a padded track, but realistically it would be a lot more money and frankly, considering carriers have relatively little ground pressure, a waste of time. Rubberized tracks might allow a bit more traction on asphalt, but probably not enough to justify their design & manufacture.
__________________
SUNRAY SENDS AND ENDS
:remember :support
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 09:00.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016