MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 31-07-13, 19:23
Ben Ben is offline
Registered User
 
Join Date: Jul 2010
Location: UK
Posts: 544
Default Rivets.....

After War and Peace i decided i really needed to crack on and get a carrier there next year. I had spoken to Israel Newton and son about replacing the rivets on the Scout previously so after confirming a date I loaded the hull onto a trailer then made the trip up the M1 to get the work done.

They specialise in building boilers and restoring steam engines. They have some enormous equipment including a 250 ton press for forming the ends of boilers from hot steel plate 1" thick. I took a couple of photos of yard as it might interest some. I would recommend anyone needing riveting or other heavy steel work to give them a call.

Photos of the yard and unloading the hull
Attached Images
File Type: jpg IMG_8300.jpg (77.5 KB, 39 views)
File Type: jpg IMG_8299.jpg (62.9 KB, 40 views)
File Type: jpg IMG_8247.jpg (45.3 KB, 40 views)
File Type: jpg IMG_8251.jpg (57.2 KB, 39 views)
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 03:51.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016