![]() |
|
#22
|
||||
|
||||
|
The bench is clear and it looks more like an engine
Generator, starter and water pump to be cleaned I have been given a flywheel and a front pulley That is about as far as I go until the piston is sorted and all these parts go in the molasses for 6 to 8 weeks I'll put the gearbox in too After that I can do the spare parts into an engine I have only 5 pistons/con-rods [30 thou and 4 rings cast iron] for it as well, as I posted one cylinder would have to be sleeved At least most of the parts won't get lost |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| 2x Chevs | Tony Smith | Auction and Classified Ad Site Heads Up | 1 | 07-09-17 09:41 |
| Afghan Chevs | David_Hayward (RIP) | The Softskin Forum | 2 | 11-12-08 17:16 |
| Yugoslave Chevs | David_Hayward (RIP) | The Softskin Forum | 0 | 11-12-08 14:35 |
| Another two Chevs on Epay | Mike K | For Sale Or Wanted | 2 | 09-05-08 11:54 |
| Peruvian Chevs | Bill Murray | The Softskin Forum | 1 | 18-09-05 09:59 |