![]() |
#12
|
|||
|
|||
![]()
The major problem the army had with Christie was he
kept changing the design in midstream,driving the cost up from the first proposal. In the first picture you are seeing one of the tracks bought and put into service by the army(3 were put into actual service) this track was named tornado and was assigned to Co.F 67 Infantry Division. The reasoning behind the acceptance of the Christe was its ability move much faster cross country,the crew could tolerate the ride much better. A secondary reason was the army's fleet of tanks were bought from Great Britian and were well past their prime,as well as being well behind the times Pat |
|
|